Arrow Marine Case Study W/ PDF - 10X Engineered Materials

Arrow Marine’s Experience (a Green Marine Member) with 10X Engineered Materials

Download the full PDF here.

Summary

Arrow Marine, a Green Marine Member, switched to 10X Engineered Materials superoxalloy blast media and achieved dramatic efficiency gains: nozzle time dropped from 45 to 15 hours, vessel turnaround shrank from 4–5 weeks to 1–2 weeks, and cleaning labor fell from 25 to 6 hours per vessel, while using 20 gallons less paint thinner per vessel blasted.

After implementing our sustainable blast media, they experienced: 

Operational Efficiency

  • 90% less front-end loader usage during blasting with 10X Engineered Materials (minimal cleanup required)
  • Significantly reduced diesel fuel consumption
  • No mid-process cleanup interruptions

Material & Waste Savings

  • 20 gallons less paint thinner per vessel blasted with 10X Engineered Materials
  • 5 gallons less paint per vessel blasted with superoxalloy
  • Eliminated 3 spray system flushed per project

Labor & Time Savings

  • 45 hours to 15 hours of nozzle time on average
  • 4-5 week turnaround to 1-2 week turnaround
  • Cleaning labor decreased from 25 hours to 6 hours per vessel

How Did 10X Engineered Materials Reduce Resource Intensity Per Vessel?

How Does Resource Intensity Reduction Compare on an Equivalency Basis?