Dec 2, 2020 | Field Reports
The Challenge A historical building was being renovated and converted into an apartment complex. Coal slag abrasive was being used to clean the structural surfaces on the inside of the building. In addition to the need for cost control and effective cleaning, the...
Dec 2, 2020 | Field Reports
The Challenge Flash rust after blasting steel can be a major scheduling challenge and cost drain for surface preparation and painting contractors. Painters have to be ready to come in right behind blasters to make sure surfaces are coated before flash rusting starts....
Dec 2, 2020 | Field Reports
The Challenge An industrial services contractor was performing a reactor maintenance turnaround project and fell behind because removal of chrome sulfur plating was too slow and, in some cases, impossible to do by blasting with crushed glass. They were warned by their...
Dec 2, 2020 | Field Reports
The Challenge A customer was using vapor blasting with garnet on galvanized beams to achieve a 2-3 mil profile without removing or damaging the base galvanized coating. This requires a highly skilled operator. They are working under SSPC SP16 specification for sweep...